marlonski | 10:53 Fri 12th Sep 2008 | DIY
4 Answers
I am about to lay some T & G flooring on new build 1st floor joists.Do I need to glue the T & G or just screw it?
Gravatar

Answers

1 to 4 of 4rss feed

Best Answer

No best answer has yet been selected by marlonski. Once a best answer has been selected, it will be shown here.

For more on marking an answer as the "Best Answer", please visit our FAQ.
It depends on what type of flooring you are going to put down. If it is T & G wooden floor boards then you need only nail it down using proper floor board nails ( cut nails ). But if it is the T & G chipboard flooring then yes to do a proper job glue the top of the joists and the T & G joints aswell plus screw them down along the joists every 300mm. If you do not you will forever have squeeky / creaking floors every time you walk on them.
Question Author
Cheers gasman , once again!
In addition to gasman's always good advice, if this is a first timer for you you'll find the job will go faster, easier and better if you can rent one of these:
http://www.tools4flooring.com/duo-fast-floorma ster-200c-hardwood-floor-nailer-p-979.html?osC sid=e9d555ca8195c4cfe3e282975f152247

Here, in the U.S., they usually rent for about $75 (US) a day plus the coil nails, which aren't very expensive. You wil need a source of compressed air and small but efficient compressors will rent for about an additional $40 per day. This way, one can drive the nail with one stroke through the fist subfloor into the next which will help assure the dreaded squeak...

Best of luck!
Firstly, if you are using timber t & g boards lay stretches of 5 boards and then cramp them together using floorboard cramps and then nailing them along the edge of each board with 3" losthead nails. Use a thick plank between the cramps and the boards to prevent damaging them.
Secondly, if you are using chipboard floor panels stagger the joints and screw them to the joists using 2" screws but I would not recommend gluing them to the joists or to each other because if plumbers or electricians need access at a later date you will regret it.