Question Author
It'll do. I take it you mean standard plastering?
When the bath was taken out (because Vera couldn't get in or out on her own) the bathroom was turned into a wet floor shower room. The wee man doing the tiling was only supposed to tile the shower bit. We paid him to do the rest. It looks much better. It's due a proper clean out. I take everything movable out, use the shower to wet everything, walls and floor, chuck some bleach about spread it all over and then leave it while I'm out doing my running around. When I get back I rinse it all over and sweep the water, bleach and gunge down the drain. A sparkling shower room.