|
Have a poke about above the plasterboard, Shirl. It would be very unusual for a pull switch to be fixed to p/board alone. There should be a ceiling joist there somewhere.
On the other hand ............ people do daft things. I've always done just what the others have said, with a piece of batten. Follow Tony's advice, with a piece that's longer than the hole so that it extends out over a good section of p/board. Either glue, or screw through the board into the batten, then polyfilla the screw head.
|